We build control cabinets in our own workshop — marshalling, system, power distribution and remote I/O — and we test every terminal before they ship. Over 2,000 m² of build and staging space, so an entire system can be assembled and integration-tested as one before it is split into shipping units.
Why in-house build matters
Panel work is the part of a control project most often sub-contracted, and it is the part where sub-contracting hurts most. When the people wiring the cabinet are not the people who configured the controller, every discrepancy becomes a three-way email.
| Sub-contracted build | In-house build |
|---|---|
| Wiring questions go back through the integrator | Engineer walks to the bench |
| FAT is the first time hardware and software meet | Integration tested continuously during build |
| Labelling conventions drift from the drawings | One drawing set, one labelling standard, one QC gate |
| Rework needs a shipment | Rework is same-day |
What we build
| Cabinet type | Typical content |
|---|---|
| System cabinets | Controllers, I/O cards, power supplies, network switches, redundant feeds |
| Marshalling cabinets | Field terminations, fused disconnects, isolators, intrinsic safety barriers, relays |
| Power distribution cabinets | UPS distribution, dual-feed changeover, circuit protection, monitoring |
| Remote I/O cabinets | Field-mounted enclosures with environmental protection and remote diagnostics |
| Operator and console furniture | Consoles, printer cabinets, engineering workstations |
Build standard
| Item | Practice |
|---|---|
| Wiring | Ferruled, numbered at both ends, matched to the loop drawing |
| Labelling | Engraved plates, one convention across the whole delivery |
| Segregation | Signal, power and intrinsically safe wiring routed separately |
| Testing | 100% point-to-point continuity, insulation resistance, power-up and burn-in |
| Records | Test sheets per cabinet, signed and handed over with the as-builts |
| Workshop discipline | 6S, under ISO 9001 / ISO 14001 / ISO 45001 |
From drawing to shipment
| Stage | Output | Gate |
|---|---|---|
| 1. GA and wiring design | Cabinet general arrangement, wiring schedule, BOM | Client design review |
| 2. Procurement | Long-lead items ordered against approved BOM | BOM sign-off |
| 3. Assembly and wiring | Cabinets built, wired, labelled | Internal QC |
| 4. Point-to-point test | Every terminal verified | Signed test record |
| 5. Integration and FAT | System powered, configured, witnessed test | Client-signed FAT report |
| 6. Pack and ship | Export packing, shipping marks, spares list | Packing list sign-off |
What drives the price
So you can sanity-check a quote rather than just compare bottom lines. Cabinet cost is mostly a function of terminal count, not cabinet count: number of I/O points and their type, redundancy level, hazardous-area requirements, ingress protection and cooling, and whether the client mandates a specific component brand list.
Scope boundary
| Included | Not included |
|---|---|
| Cabinet design, build, wiring, labelling and factory test | Field instruments and field cabling |
| Integration with the control system we configure | Site civil works and cabinet foundations |
| Export packing and shipping documentation | Freight, duties and site unloading |
Send us a cabinet schedule
An I/O list and a preliminary cabinet schedule are enough for a real number. Contact us.