Control Cabinet Manufacturing

We build control cabinets in our own workshop — marshalling, system, power distribution and remote I/O — and we test every terminal before they ship. Over 2,000 m² of build and staging space, so an entire system can be assembled and integration-tested as one before it is split into shipping units.

Why in-house build matters

Panel work is the part of a control project most often sub-contracted, and it is the part where sub-contracting hurts most. When the people wiring the cabinet are not the people who configured the controller, every discrepancy becomes a three-way email.

Sub-contracted buildIn-house build
Wiring questions go back through the integratorEngineer walks to the bench
FAT is the first time hardware and software meetIntegration tested continuously during build
Labelling conventions drift from the drawingsOne drawing set, one labelling standard, one QC gate
Rework needs a shipmentRework is same-day

What we build

Cabinet typeTypical content
System cabinetsControllers, I/O cards, power supplies, network switches, redundant feeds
Marshalling cabinetsField terminations, fused disconnects, isolators, intrinsic safety barriers, relays
Power distribution cabinetsUPS distribution, dual-feed changeover, circuit protection, monitoring
Remote I/O cabinetsField-mounted enclosures with environmental protection and remote diagnostics
Operator and console furnitureConsoles, printer cabinets, engineering workstations

Build standard

ItemPractice
WiringFerruled, numbered at both ends, matched to the loop drawing
LabellingEngraved plates, one convention across the whole delivery
SegregationSignal, power and intrinsically safe wiring routed separately
Testing100% point-to-point continuity, insulation resistance, power-up and burn-in
RecordsTest sheets per cabinet, signed and handed over with the as-builts
Workshop discipline6S, under ISO 9001 / ISO 14001 / ISO 45001

From drawing to shipment

StageOutputGate
1. GA and wiring designCabinet general arrangement, wiring schedule, BOMClient design review
2. ProcurementLong-lead items ordered against approved BOMBOM sign-off
3. Assembly and wiringCabinets built, wired, labelledInternal QC
4. Point-to-point testEvery terminal verifiedSigned test record
5. Integration and FATSystem powered, configured, witnessed testClient-signed FAT report
6. Pack and shipExport packing, shipping marks, spares listPacking list sign-off

What drives the price

So you can sanity-check a quote rather than just compare bottom lines. Cabinet cost is mostly a function of terminal count, not cabinet count: number of I/O points and their type, redundancy level, hazardous-area requirements, ingress protection and cooling, and whether the client mandates a specific component brand list.

Scope boundary

IncludedNot included
Cabinet design, build, wiring, labelling and factory testField instruments and field cabling
Integration with the control system we configureSite civil works and cabinet foundations
Export packing and shipping documentationFreight, duties and site unloading

Send us a cabinet schedule

An I/O list and a preliminary cabinet schedule are enough for a real number. Contact us.

Send us a cabinet schedule

An I/O list and a preliminary cabinet schedule are enough for a real number rather than a placeholder.